Our Process: Your ADU, Built with Ease and Confidence

Our Process: Your ADU, Built with Ease and Confidence

At Contemporary Tiny Homes, we make building your ADU simple and stress-free.

We'll handle all aspects of the process for you, from designing your custom home, obtaining all necessary permits from your town, preparing the construction site, doing all the excavation and building your foundation, doing the permanent connections to all utilities (water, sewer and electricity) and building your home including interior & exterior finishes, and all bathroom, kitchen & lighting fixtures.

Phase 1: Feasibility & Design

Timeline: Less than 1 Month

Close-up of two people collaborating on construction blueprints with pencils, planning a building project. A white hard hat and yellow helmet are visible in the background, emphasizing the design and planning phase of construction work.

We start by working closely with you to finalize the design and specifications of your ADU. During this phase, you’ll:

  • Choose colors, flooring, cabinetry, fixtures, and lighting.

  • Make slight adjustments to the floor plan, with options for larger changes if needed (costs may vary).

We’ll coordinate a site survey to evaluate your property. For homes with wells or septic systems, additional engineering may be necessary to assess water and sewer capacity.

Phase 2: Permit Application

Timeline: Typically a Month or Two

Once your design and site survey are complete, we’ll prepare and submit all necessary documentation to obtain the required permits from your local authorities. This includes:

  • Site survey data.

  • Finalized plans and specifications.

  • Any required engineering reports.

  • All required Construction Documents (CDs).

While permit timelines vary depending on your town, we handle the process efficiently to keep your project on track.

Close-up of two people collaborating on construction blueprints with pencils, planning a building project. A white hard hat and yellow helmet are visible in the background, emphasizing the design and planning phase of construction work.

Phase 3: Construction

Timeline: Approximately 3–4 Months

Close-up of two people collaborating on construction blueprints with pencils, planning a building project. A white hard hat and yellow helmet are visible in the background, emphasizing the design and planning phase of construction work.

This is where your ADU starts to take shape! During construction, we:

  • Prepare the site by installing a tracking pad, dumpster, and portable facilities.

  • Excavate and pour the concrete for the foundation.

  • Frame the structure, add the roof, siding, doors, and windows.

  • Complete interior work, including plumbing, electrical, HVAC, insulation, drywall, flooring, and finishes.

  • Install cabinetry, countertops, fixtures and, as an option, appliances.

The result? A fully finished ADU, ready for move-in!

Phase 4: Final Walkthrough & Delivery

Timeline: Approximately 1-2 Weeks

Before handing over the keys, we invite you to a final walkthrough of your new ADU. This allows us to:

  • Ensure every detail is completed to your satisfaction and as agreed upon.

  • Make any final adjustments needed.

Once approved, your ADU is ready for you to enjoy!

Close-up of two people collaborating on construction blueprints with pencils, planning a building project. A white hard hat and yellow helmet are visible in the background, emphasizing the design and planning phase of construction work.

Why Choose Us?

Why choose Contemporary Tiny Homes to build your ADU?

Clear Communication: We keep you informed every step of the way.
Expert Guidance: From design to permits, we simplify the process for you.

High-Quality Craftsmanship: We build ADUs that stand the test of time.

What are the financing options available for building an ADU

Options include home equity loans, construction loans, cash-out refinancing, and personal loans. Learn more about our financing options.

Can I build a tiny home / ADU / in-law suite / granny flat in my backyard?

Yes, as long as your property complies with zoning and setback regulations.

From signing a contract to receiving my keys, how long does it take to build my ADU?

It takes approximately six months.

What We Offer

The Contemporary Tiny Homes Difference

805 sqft 2-Bedroom Tiny Home

Our expert team specializes in garage ADU designs that seamlessly integrate with your home. From initial feasibility reports to construction and finishing touches, we manage every step of the process. Our designs ensure your garage ADU is functional, energy-efficient, and tailored to meet your needs.

Discover Our ADU Solutions

Explore our custom-built options to transform your property with functional and stylish ADU designs.

Explore ADU designs crafted to suit a range of styles.

A flexible ADU tailored to your lifestyle and property.

Seamlessly expand your home with a connected ADU.

Convert your basement into a versatile living area.

Upgrade your outdoor space with a stylish space.

Copyright 2025. All rights reserved. Norwalk, CT

Connecticut's New Home Construction Contractor License: #NHC.0017654

EPA Lead-Safe Certified NAT-F269966-1

Copyright 2025. All rights reserved. Norwalk, CT

Connecticut's New Home Construction Contractor License: #NHC.0017654

EPA Lead-Safe Certified NAT-F269966-1